lessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/style.less Engineering 2K | General Contractor Immobili
Latest news:
COLLEFERRO: DELIVERED A LOGISTIC WAREHOUSE OF MORE THAN 100,000 SQM
  • Punctuality and quality

    In Colleferro we have built a logistics warehouse that occupies an area of ​​over 100,000 sqm in just 16 months of work.

  • Punctuality and quality

    In Colleferro we have built a logistics warehouse that occupies an area of ​​over 100,000 sqm in just 16 months of work.

  • Punctuality and quality

    In Colleferro we have built a logistics warehouse that occupies an area of ​​over 100,000 sqm in just 16 months of work.

  • Research and innovation

    Every construction is a source of pride, for the continuous innovation in construction techniques and materials, and for the perfection in execution
.

  • Research and innovation

    Every construction is a source of pride, for the continuous innovation in construction techniques and materials, and for the perfection in execution
.

  • Research and innovation

    Every construction is a source of pride, for the continuous innovation in construction techniques and materials, and for the perfection in execution
.

Engineering 2K

Engineering 2K is a leading General Contractor company in the logistic sector in Italy and Europe, backed up by the experience of more than 80 professionals between internal and external resources. With over 3 million square metres of covered space, Engineering 2K is the sole partner for turnkey solutions for unique buildings, from design to construction.

Latest Projects


  • Colleferro A
      CA 104.681 sqm GFA Tot 104.846 sqm (mezzanine excluded) GFA Depot 100.024 sqm GFA Offices 4.822 sqm Useful Height 11,20 m sum/win Depot Conditioning Yes sum/win Offices Conditioning Yes Sprinkler System NFPA/FM Car parks 798 Truck parks 149 Equipped loading bays 84 Start of work 19th August 2019 End of work 30th September 2020
    Read more
  • Parma
      CA 10.081 sqm GFA Tot 6.529 sqm GFA Depot 5.379 sqm GFA Offices 1.150 sqm Useful Height 10,40 m sum/win Depot Conditioning Yes sum/win Offices Conditioning No Sprinkler System No Car parks 118 Truck parks 412 Equipped loading bays 7 Start of work 4th May 2020 End of work 5th October 2020
    Read more
  • Colleferro B
      CA 53.405 sqm GFA Tot 53.995 sqm GFA Depot 52.895 sqm GFA Offices 1.100 sqm Useful Height 10,20 m (min under beam) sum/win Depot Conditioning No sum/win Offices Conditioning Yes Sprinkler System NFPA Car parks 137 Truck parks 37 Equipped loading bays 76 Start of work 17th June 2019 End of work 30th August 2020
    Read more

Latest Video


In mid-July we have delivered the widening of a warehouse already present in Pontenure: a job of 10 months that has led us to construct a second warehouse of almost 30.000 square metres. How did we do it? We summarize it in 1 minute up here.
Our drone scoured the corners of the Piacenza shipyard, picking up some details of our team's work. Here are some moments of a day on the field.
How to inspect thousands of square meters of construction at speed? Obviously at a fast pace. Watch the video.

















Social


Comments Box SVG iconsUsed for the like, share, comment, and reaction icons

Eng2k Facebook

This message is only visible to admins:
Problem displaying Facebook posts.

Error: Error validating access token: The session has been invalidated because the user changed their password or Facebook has changed the session for security reasons.
Type: OAuthException
Code: 190
Subcode: 460

Newsletter

Valid only for Italian site.

Engineering 2K