lessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/style.less 2013-Bologna Interporto 10.4 - Engineering 2K

2013-Bologna Interporto 10.4

(Italiano) 2013- BOLOGNA INTERPORTO 10.4

2013-Bologna Interporto 10.4
 

Deposit 28.300 mq.
Offices 1.495 mq.
Working Height 11,90 m
Electro Platforms 44
Sprinkler system under NFPA 13 20
Work Start dicembre 2011
Work End marzo 2013
Property HINES Italia SGR SpA
Conductor GSI SpA

Comments are closed.

Engineering 2K