lessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/style.less
Colleferro B - Engineering 2K
| CA |
53.405 sqm |
| GFA Tot |
53.995 sqm |
| GFA Depot |
52.895 sqm |
| GFA Offices |
1.100 sqm |
| Useful Height |
10,20 m (min under beam) |
| sum/win Depot Conditioning |
No |
| sum/win Offices Conditioning |
Yes |
| Sprinkler System |
NFPA |
| Car parks |
137 |
| Truck parks |
37 |
| Equipped loading bays |
76 |
| Start of work |
17th June 2019 |
| End of work |
30th August 2020 |