lessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/style.less Archivio Archivi - Page 4 of 9 - Engineering 2K Archive | Engineering 2K

Portfolio Category: Archivio

2009-Castel S.G. (PC) Corpo L

2009-Castel S.G. (PC) Corpo L   Deposit 20.822 mq Offices 1.200 mq. Working Height 10,50 m Electro Platforms 30 Work Start luglio 2008 Work End marzo 2009 Property DEKA/BSL/DSV Conductor DEKA/BSL/DSV
Per saperne di più

2008-Rovigo

2008-Rovigo   Deposit 41.000 mq. Offices 2.540 mq. Working Height 10,50 m. Electro Platforms 52 Sprinkler system under NFPA 13 20 Work Start dicembre 2007 Work End settembre 2008 Property DEKA Conductor BSL SpA
Per saperne di più

2007-Castel S.G. (PC) Corpo II

2007-Castel S.G. (PC) Corpo II   Deposit 21.600 mq. Offices 745 mq. Working Height 10,50 m. Electro Platforms 22 Sprinkler system under UNI 9489 Work Start luglio 2006 Work End marzo 2007 Property CSGIL Srl Conductor ADB Bertola
Per saperne di più

2007-Castel S.G. (PC) Corpo I

2007-Castel S.G. (PC) Corpo I   Deposit A e B 24.590 – 45.370 mq. Offices 1.430 – 1.510 mq. Working Height 10,50 m Electro Platforms n°36 – n°38 Work Start 04/2005 – 10/2004 Work End 12/2005 – 09/2005 Property CSG Srl Conductor Rajapack- BSL Srl
Per saperne di più

Engineering 2K