lessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /var/www/vhosts/eng2k.com/httpdocs/wp-content/themes/theme54850/style.less Industriali Archivi - Page 3 of 12 - Engineering 2K Archive | Engineering 2K

Portfolio Category: Industriali

Passo Corese

    Passo Corese Total area 18.826,00 mq Depot 17.525,00 mq Offices 1.218,00 mq Useful height
 10,50 m Electro-hydraulic platforms 108 Sprinkler system NO Car parking 101 Parking TIR 47 Work start
 Giugno 2019 End of works Febbraio 2020
Per saperne di più

Bologna 13.7

    Bologna 13.7 Total Area 35.900,00 mq Deposit 19.500,00 mq Offices 500,00 mq Working Height 12,00 m max - 11,00 m min Car parking spaces total 66 - n.2 disabled - 4 electric cars Van parking spaces 0 Electro-hydraulic platforms 20 Work Start

 January 2019 Work End

 September 2019
Per saperne di più

Vescovana Padova

    Vescovana Padova Total Area 35.873,00 mq Deposit 34.574,00 mq Offices 1.299,00 mq Working Height 11,40 m Electro-hydraulic platforms 30 Work Start

 February 2019 Work End

 September 2019
Per saperne di più

Casirate B2

    Casirate B2 Total Area 54.913,05 mq Deposit 52.828,92 mq Offices 1033,71 mq Working Height 10,00 m Fire Department Plant SPK and Foamt Car parking spaces 190 Truck parking spaces 25 Electro-hydraulic platforms 60 Work Start

 March 2019 Work End

 September 2019
Per saperne di più

Engineering 2K